Migrations without surprises.
Lift-and-shift, re-architect, multi-cloud or out-of-cloud — migrations executed in phases with parallel running, cost projection and a real cutover plan. Not a hopeful weekend.
The problem we solve
Cloud migrations done badly produce three artifacts: a higher bill, the same architecture in a different vendor's lobby, and an exhausted team. Done well, they unlock years of engineering velocity. The difference is preparation, phasing, parallel running and brutal honesty about cost.
What we do
- 01Migration strategy: lift-and-shift, replatform, re-architect, hybrid
- 02Cost modelling for source and target environments
- 03Network and identity migration
- 04Database migration with replication and back-fill
- 05Application migration in phases with feature flags
- 06Storage migration including data lifecycle
- 07Multi-cloud and exit migration (off-cloud)
- 08DR strategy in the new environment
- 09Cutover and rollback runbook
- 10Post-migration cost optimization
What you receive
- Migration plan with phases, risk and rollback for each
- Cost model showing realistic before/after
- Cutover runbook executed under our supervision
- Post-migration optimization to capture FinOps savings
Migration tools
Ideal for
- → On-prem workloads moving to cloud
- → AWS → GCP, GCP → AWS, multi-cloud strategies
- → Companies leaving the cloud for cost reasons
- → M&A scenarios requiring environment consolidation
How an engagement runs
- 01
Assess
Source environment inventory, target architecture, cost model. Written plan with realistic timeline.
- 02
Build target
Target environment built as infrastructure-as-code, ready for parallel running.
- 03
Migrate in phases
Workloads migrated in priority order, with replication and verification at each step.
- 04
Cutover
Final cutover with rollback ready. Post-migration optimization to capture savings.
How to engage
Migration Strategy
Assessment, target architecture, cost model and migration plan.
Full Migration
Strategy plus execution end-to-end, including cutover and optimization.
Frequently asked.
01Will the migration cost us more on day one?
Often yes — there's a transition tax. Done well, the bill drops below the original within 6 — 12 months through right-sizing and reservation. We model this honestly up front.
02Do you do off-cloud migrations?
Yes. Several recent engagements have been moving cost-heavy workloads off the hyperscalers to Hetzner, OVH or own-hardware setups. Honest assessment — it's right for some companies and wrong for others.
Have a problem worth solving well?
Tell us the outcome you want. We'll tell you what it takes — honestly, within a week, in writing.
Start a conversation